SACAA Programs

EDTO LMS Program (FOO 005)


Description

EDTO Operations:

“Any operation by an Aero- plane with two or more turbine engines where the diversion time to an en‐route alternate aerodrome is greater than the threshold time established by the State of the Operator.”

EDTO (ICAO) and ETOPS (FAA) covers Aircraft fitted with all types of engines including diversion time greater than 180 minutes.

ETOPS (EASA) covers Aircraft fitted with Twins engines including diversion time greater than 180 minutes and

LROPS (EASA) covers three or four engine A/C and applies on routes with diversion time more than 180 minutes.

Content
  • Policy and General
  • Introduction to EDTO
  • EDTO Intro
  • test_1561988699
  • Design Features and Criteria
  • EDTO Module 2 Terminology.pptx
  • Operational Approval Criteria
  • Operational Approval
  • EDTO Maintenance Reliability
  • EDTO Flight Planning
  • EDTO Aerodrome selection
  • EDTO Flight Dispatch Procedures
  • EDTO Resource Management
Completion rules
  • All units must be completed
  • Leads to a certification with a duration: 1 year